MedTech Startup Toolkit
Nine free, plain-English tools that explain what FDA, investors and manufacturers expect from a medical device startup, and why. Get your bearings, then bring sharper questions to your team, your advisors and FDA.
Learn the what and the why
Pick a tool. Each one explains a part of the medical device journey in plain English, with no email, no sign-up and nothing to download.
Is my product a medical device?
Answer a few questions about what your product does and what you will say about it. You will see how FDA is likely to view it, and why.
Which FDA pathway fits your device?
Four questions about risk and comparable devices. You will get the likely device class, the premarket pathway, this year’s FDA user fee and what FDA expects to see.
Design controls, explained
Design controls are the disciplined way you turn “what people need” into a device you can prove works. Here is each step, what it is for and the trap startups fall into.
Quick self-check: are you ready for design freeze?
0 of 6Since February 2, 2026, FDA’s Quality Management System Regulation (QMSR, 21 CFR Part 820) incorporates ISO 13485:2016 by reference, so design and development requirements now follow ISO 13485 clause 7.3. Design controls apply to Class II and Class III devices and to some Class I devices.
Are you ready for a Pre-Submission?
A Pre-Submission (Pre-Sub) is a free way to get FDA’s written feedback on your plans before you spend on testing. Tick what you have. The meter shows how ready you are and what is still missing.
What a contract manufacturer needs from you
Before you ask a contract manufacturer (CM) to quote, check what you can hand over. Every gap becomes an assumption in their quote, and assumptions become change orders later.
OEE calculator
Overall equipment effectiveness (OEE) shows how much of your planned production time actually makes good parts. Enter one shift and see availability, performance, quality, where the time went, and whether the equipment can meet your demand.
OEE = availability × performance × quality. Availability = run time ÷ planned time. Performance = (ideal cycle time × parts made) ÷ run time. Quality = good parts ÷ parts made. 85% is often quoted as world class for discrete manufacturing; new equipment usually starts lower during ramp-up.
HMI screen builder
Sketch the operator screens for your machine. Drag buttons, indicators, gauges, trends, alarm lists and tables onto the panel, link buttons and tiles to other screens, then press Preview and click through it like the real thing.
The builder works best on a laptop or tablet. On a phone you can still open Preview and click through the example.
Loading the builder…
Your design is saved in this browser only. Use Save file to keep a copy or share it. Layout follows high-performance HMI practice: calm colors, color for abnormal states, the same navigation on every screen.
Investor-readiness milestone map
MedTech investors fund the removal of risk: clinical, technical, regulatory, reimbursement and team risk. Choose the round you are raising, tick what you have done, and see what usually needs to be true first.
Expectations vary by investor, device type, market and the wider funding climate. This map shows common patterns, not rules.
Glossary and myth-busters
The terms you will hear from FDA, engineers, manufacturers and investors, in plain English. Then test yourself on the myths we hear most often.
Myth-busters
Tap a card to see the fact.Educational information only. These tools explain general concepts. They are not regulatory, legal or investment advice, and FDA makes the final call on any device. Fees and timelines are FDA figures for fiscal year 2027 (October 1, 2026 to September 30, 2027).
Plan your timeline and budgetWant a second set of eyes on your plan?
Bring what you learned here to a free 30-minute discovery call. We will talk through your device, your pathway and what to do next.

