Home  /  Startup Toolkit
Free learning tools

MedTech Startup Toolkit

Nine free, plain-English tools that explain what FDA, investors and manufacturers expect from a medical device startup, and why. Get your bearings, then bring sharper questions to your team, your advisors and FDA.

No email requiredPlain EnglishUpdated for 2026 rules and fees
Nine free tools

Learn the what and the why

Pick a tool. Each one explains a part of the medical device journey in plain English, with no email, no sign-up and nothing to download.

Explainer

Is my product a medical device?

Answer a few questions about what your product does and what you will say about it. You will see how FDA is likely to view it, and why.

Why it mattersWhether your product is a device decides everything that follows: the rules, the cost and the timeline. And it is decided mostly by your claims, not your technology.
Quiz

Which FDA pathway fits your device?

Four questions about risk and comparable devices. You will get the likely device class, the premarket pathway, this year’s FDA user fee and what FDA expects to see.

Why it mattersThe pathway sets your evidence plan, your budget and how long FDA review takes. Getting it wrong is one of the most expensive mistakes a startup can make.
Plain-English guide

Design controls, explained

Design controls are the disciplined way you turn “what people need” into a device you can prove works. Here is each step, what it is for and the trap startups fall into.

Why it mattersFDA will review this record. Building it as you go costs a little discipline; rebuilding it later can cost months.
User needs Design inputs Design process Design outputs Medical device Verification: did we build the design right? Validation: did we build the right device? Design reviews at each stage · Risk management throughout · Design changes controlled · Everything recorded in the design file STARTTRANSFER

Quick self-check: are you ready for design freeze?

0 of 6

Since February 2, 2026, FDA’s Quality Management System Regulation (QMSR, 21 CFR Part 820) incorporates ISO 13485:2016 by reference, so design and development requirements now follow ISO 13485 clause 7.3. Design controls apply to Class II and Class III devices and to some Class I devices.

Checklist

Are you ready for a Pre-Submission?

A Pre-Submission (Pre-Sub) is a free way to get FDA’s written feedback on your plans before you spend on testing. Tick what you have. The meter shows how ready you are and what is still missing.

Why it mattersFDA can only react to what you send. Specific proposals get specific answers; vague questions get vague ones. FDA’s goal is to send written feedback in about 70 days.
0%
Checklist

What a contract manufacturer needs from you

Before you ask a contract manufacturer (CM) to quote, check what you can hand over. Every gap becomes an assumption in their quote, and assumptions become change orders later.

Why it mattersA complete package gets you comparable quotes, a faster start and fewer surprises in cost and schedule.
0%
Calculator

OEE calculator

Overall equipment effectiveness (OEE) shows how much of your planned production time actually makes good parts. Enter one shift and see availability, performance, quality, where the time went, and whether the equipment can meet your demand.

Why it mattersOEE turns “the line feels slow” into numbers you can act on, and tells you whether you need a faster machine, a second shift or just fewer stops.

OEE = availability × performance × quality. Availability = run time ÷ planned time. Performance = (ideal cycle time × parts made) ÷ run time. Quality = good parts ÷ parts made. 85% is often quoted as world class for discrete manufacturing; new equipment usually starts lower during ramp-up.

Builder

HMI screen builder

Sketch the operator screens for your machine. Drag buttons, indicators, gauges, trends, alarm lists and tables onto the panel, link buttons and tiles to other screens, then press Preview and click through it like the real thing.

Why it mattersAgreeing on the screens early saves controls programming time and gives operators a say before the machine is built.

The builder works best on a laptop or tablet. On a phone you can still open Preview and click through the example.

Loading the builder…

Your design is saved in this browser only. Use Save file to keep a copy or share it. Layout follows high-performance HMI practice: calm colors, color for abnormal states, the same navigation on every screen.

Milestone map

Investor-readiness milestone map

MedTech investors fund the removal of risk: clinical, technical, regulatory, reimbursement and team risk. Choose the round you are raising, tick what you have done, and see what usually needs to be true first.

Why it mattersEach milestone retires a risk and raises what the company is worth. Raising before the right milestones usually means more dilution or a harder raise.
Which round are you preparing for?
0%

Expectations vary by investor, device type, market and the wider funding climate. This map shows common patterns, not rules.

Glossary

Glossary and myth-busters

The terms you will hear from FDA, engineers, manufacturers and investors, in plain English. Then test yourself on the myths we hear most often.

Why it mattersSpeaking the language makes every meeting shorter and every quote easier to compare.

Myth-busters

Tap a card to see the fact.

Educational information only. These tools explain general concepts. They are not regulatory, legal or investment advice, and FDA makes the final call on any device. Fees and timelines are FDA figures for fiscal year 2027 (October 1, 2026 to September 30, 2027).

Plan your timeline and budget
Next step

Want a second set of eyes on your plan?

Bring what you learned here to a free 30-minute discovery call. We will talk through your device, your pathway and what to do next.