Home  /  The MedTech Process
A founder’s guide

How the medical device process really works.

From a clinical insight to a product hospitals buy: the stages, FDA pathways, funding milestones, partners and decisions every MedTech startup and entrepreneur faces, and how to sequence them so capital buys real progress.

01 · The ecosystem

It takes an ecosystem to build a medical device.

The founder owns the vision, but a device reaches patients only when many specialized disciplines contribute at the right moment. One startup. Many capabilities. Not all of them needed on day one.

Clinical

  • Physicians and nurses
  • Key opinion leaders
  • End users and patients

Product development

  • Engineering & industrial design
  • Human factors
  • Program management

Quality & regulatory

  • Quality management system
  • Regulatory strategy
  • Risk management & design controls

Testing

  • Bench and performance testing
  • Preclinical and clinical studies
  • Biocompatibility, sterilization, packaging

Manufacturing

  • Contract manufacturers
  • Suppliers and tooling
  • Process engineering

Business

  • Market research
  • Reimbursement
  • Finance, investors & fundraising

Commercial

  • Sales and distribution
  • Marketing
  • Strategic partnerships

Where Birch Design fits

We lead the product, regulatory and manufacturing threads and bring in trusted suppliers, test labs, specialists and contract manufacturers, so you don’t have to hire every function.

Early on, most startups are deep in engineering and clinical work, lightly involved in quality, regulatory and business planning, and barely engaged with testing, manufacturing and commercial partners. The job is to bring each one in before it becomes the bottleneck, not after.

02 · Project types & strategy

Not every medical device project is the same.

Before choosing a partner or a budget, be clear about what kind of project you are running and where you ultimately want the company or technology to go.

Project typeThe question it answersTypical starting point
Full developmentHow do we turn this opportunity into a complete commercial product?A clinical need or early concept; no finished design
Feasibility / prototypeCan this concept actually work?An idea with high technical or usability risk
Design transfer / build to printHow do we reliably manufacture what has been designed?A mature design with drawings, BOM and specifications
Next-generation developmentHow do we make the current product better?An existing product with known improvement goals
Animal study programWhat evidence do we need before moving forward clinically?Design-representative devices and a study hypothesis
Clinical trial programHow do we demonstrate performance and clinical value in real-world use?Verified devices and a regulatory strategy
Strategy A

Build to scale

The startup intends to develop the complete product, own the regulatory strategy, transfer into manufacturing, build commercial operations and launch.

Requires more capital, a larger internal organization and strong long-term manufacturing and commercial partnerships.

Strategy B

Build to partner or exit

The startup intends to demonstrate feasibility, develop intellectual property, generate preclinical or clinical evidence and reach a value inflection point, then license or sell.

The company may not need to build the entire commercialization infrastructure itself.

The development plan should match the exit strategy. Many founders keep both options open through feasibility.

03 · The development path

The eight stages of medical device development.

Each stage answers a specific question and produces evidence the next stage depends on. Under FDA design controls, much of that evidence must be documented as you go, which is why the order matters.

01

Concept & user needs

Define the clinical problem, the users, the use environment and what the device must do. This is where the business case and the regulatory hypothesis start.

Gate question: Is this a real problem worth solving, for a buyer who will pay?
Key outputs
  • User needs and intended use
  • Initial design inputs and requirements
  • Early regulatory and reimbursement hypothesis
02

Feasibility

Build proof-of-concept prototypes and test the highest-risk technical and usability questions on the bench, in models or in cadaver labs, with early clinician feedback.

Gate question: Can it work, and is it worth the next investment?
Key outputs
  • Functional prototypes
  • Bench data on the riskiest questions
  • Clinician feedback and a clearer architecture
03

Design & development

Iterate the design under design controls: design reviews, risk management (ISO 14971), design for manufacturability and supplier selection, ending at design freeze.

Gate question: Is the design ready to freeze and test formally?
Key outputs
  • Design history file and risk file
  • DFM review and first cost-of-goods estimate
  • Design-representative builds
04

Verification & validation

Prove the design meets every requirement (verification) and every user need (validation): performance testing, biocompatibility, sterilization and packaging validation, software and human factors.

Gate question: Does the device meet every requirement and user need?
Key outputs
  • V&V protocols and reports
  • Biocompatibility, sterilization and shelf-life data
  • Formative and summative usability studies
05

Clinical evidence

Generate the preclinical and clinical evidence the pathway requires, from animal studies to first-in-human and pivotal trials, with IRB and, when needed, FDA IDE approval.

Gate question: Do the data show safety and performance in people?
Key outputs
  • Animal and cadaver study reports
  • IDE or IRB approvals and study protocols
  • Clinical data and study report
06

Regulatory submission

Assemble and submit the 510(k), De Novo or PMA, respond to FDA questions, and confirm your quality system is ready for the Quality Management System Regulation (QMSR).

Gate question: Is the evidence strong enough for the chosen pathway?
Key outputs
  • Pre-Submission feedback from FDA
  • Submission package and responses
  • Clearance, grant or approval
07

Design transfer

Move the design into repeatable production with a contract manufacturer or internal line: process development, tooling, fixtures, IQ/OQ/PQ validation and supplier qualification.

Gate question: Can we build it consistently, at the target cost?
Key outputs
  • Manufacturing process and work instructions
  • Process validation (IQ/OQ/PQ)
  • Qualified suppliers and pilot builds
08

Launch & scale

Prepare launch inventory, commercial partners and training, then scale volume with yield improvement and, when it pays off, automation, while post-market processes run.

Gate question: Will clinicians, hospitals and payers adopt it?
Key outputs
  • Commercial supply and distribution plan
  • Post-market surveillance and complaint handling
  • Scale-up and automation roadmap
04 · Regulatory pathways

How FDA classifies and clears medical devices.

Your device’s risk class largely determines the regulatory pathway, and the pathway drives the evidence, budget and timeline for everything upstream.

Class I

Low risk

General controls. Most Class I devices are exempt from premarket notification but still need registration, listing and quality requirements.

Class II

Moderate risk

General and special controls. Most require a 510(k) showing substantial equivalence to a legally marketed predicate device.

Class III

High risk

Life-supporting, life-sustaining or implantable devices with significant risk. Most require Premarket Approval (PMA) with clinical data.

PathwayWhen it appliesTypical evidenceFDA review goalFY2027 user fee
ExemptMany Class I and some Class II devicesDesign controls where required, labeling, registrationNo premarket reviewAnnual establishment registration $13,785
510(k)A predicate device existsBench performance, biocompatibility, software, sometimes clinical90 FDA days$28,653 ($7,163 small business)
De NovoNovel, low-to-moderate risk, no predicateBench plus often clinical data; proposed special controls150 FDA days$191,020 ($47,755 small business)
PMAClass III, high riskValid scientific evidence, usually a pivotal clinical study; manufacturing inspection180 FDA days (longer with an advisory panel)$636,732 ($159,183 small business)

Pre-Submission (Q-Sub)

Free written FDA feedback on your pathway, testing and study plans, typically about 70 days after FDA receives the request. The best-value regulatory step most startups can take.

Investigational Device Exemption

A significant-risk clinical study in the U.S. needs an approved IDE from FDA plus IRB approval before enrolling patients.

Quality system (QMSR)

Since February 2, 2026, FDA’s Quality Management System Regulation incorporates ISO 13485:2016 by reference. Size your QMS to your stage, but start design controls early.

“FDA days” exclude time a submission is on hold waiting for your answers, so real calendar time is usually longer. Fees are FDA’s fiscal year 2027 rates (October 1, 2026 to September 30, 2027). Sources: FDA, Medical Device User Fee Rates for FY2027, FDA Q-Submission Program, FDA QMSR. General information, not regulatory advice for a specific device.

05 · Funding & milestones

Spend to the next value milestone.

For a startup, technical decisions are business decisions. The goal is not just to move the product forward; it is to reach the next meaningful milestone without exhausting time or capital.

Investment should rise as confidence rises. Small, focused spending while uncertainty is high; larger commitments to tooling, validation and manufacturing once the riskiest questions are answered.

ConceptMilestone 1FeasibilityMilestone 2DevelopmentMilestone 3VerificationMilestone 4TransferMilestone 5ProductionMilestone 6Investment (cost)Confidence (lower risk)
Small investment

Concept & feasibility

  • Early engineering
  • Initial prototypes
  • Technical evaluation
Moderate investment

Development & verification

  • Design and development
  • Iterative prototypes
  • Testing and studies
Larger investment

Transfer, tooling & validation

  • Manufacturing development
  • Tooling and process development
  • Validation and regulatory prep
Scale investment

Production & commercialization

  • Full manufacturing
  • Supply chain
  • Commercial launch
Illustrative example

A startup with 18 months of runway

An entrepreneur has raised $1.5M, has $1.2M in the bank and a team of three. The next funding round depends on one thing: proving the core design works.

$1.5MCapital raised
$1.2MCash remaining
18 moRunway
3Team members
Option A

Build the organization now

Commit roughly $700K over the next year to hire full-time engineers, set up internal quality and regulatory infrastructure, start manufacturing development and add early commercial resources.

About $500K leftand the most important technical question may still be unanswered.
Option B · Recommended

Fund the next milestone

Commit about $150K to a focused four-month feasibility program: $60K fractional engineering and program leadership, $45K prototype iterations, $20K bench testing, $15K clinician evaluation and $10K quality and regulatory guidance.

About $1.05M still availableplus five functional prototypes, repeatable bench performance, feedback from three physicians, a clearer architecture and a better cost estimate.

Hypothetical figures for illustration only. Your numbers depend on the device, pathway and team. Model yours in the Journey Planner.

06 · Choosing partners

Who should help you build it?

There are four ways to turn a medical innovation into a real device. Most successful startups use more than one, adding infrastructure as the product matures.

Internal team

Full-time hires give control and continuity, but create significant fixed burn before technical feasibility is established.

Flexibility
Infrastructure
Cost
Best once the product and funding are stable

Consultants & fractional experts

Senior expertise that expands and contracts with the need. You pay for the work, not the overhead.

Flexibility
Infrastructure
Cost
Best early, and for specialized gaps

Product development firm

Broad engineering capability under one roof, with moderate flexibility and moderate-to-high project cost.

Flexibility
Infrastructure
Cost
Best for complex, well-funded builds

Contract manufacturer

A higher-commitment partner built to eventually manufacture your product, often with design and prototyping capacity.

Flexibility
Infrastructure
Cost
Best as the design matures toward transfer

Start lean. Add infrastructure as the product matures.

The network is part of the capability

No development company has every capability under one roof. A strong partner is valuable not only for what it can do internally, but for who it can bring into the program: clinical experts, test labs, sterilization and packaging suppliers, tooling vendors, contract manufacturers, regulatory specialists and investors. Trusted introductions save both time and risk.

07 · Contracting a development partner

The right partner for the next stage, not every stage.

Your first engagement does not need to cover the entire product lifecycle. Many long-term development relationships begin with one clearly defined project.

Targeted project

Solve one defined problem.

Example: “Build and evaluate our next prototype.”

Milestone project

Reach a specific development milestone.

Example: “Prepare devices for an animal study.”

Ongoing support

Provide recurring engineering or program resources.

Example: “Improve this existing product.”

Full development

Take responsibility for a major portion of product development.

Example: “Complete the remaining development before transfer.”

A staged engagement in practice

Instead of signing a $750K full-development contract up front, a startup funds one phase at a time and decides at each gate whether the next phase is justified.

$42K6-week feasibility sprint

Improve the core mechanism, build five prototypes, bench-test performance and recommend next steps. Result: you learn whether the core technology deserves more investment.

$225KDevelopment phase

Funded only after feasibility passes: design iterations under design controls, DFM and design-representative builds.

$350KVerification & transfer prep

Formal testing, documentation and manufacturing preparation once the design is stable.

Which contract model fits?

ModelBest whenExampleAdvantageTrade-off
Time & materialsThe scope is still evolving“Help us iterate the mechanism.”High flexibilityLess total-cost certainty
Defined milestonesThe outcome can be clearly describedDeliver 10 design-representative prototypes for bench testingBetter budget and schedule visibilityScope changes may need change orders
Fractional / retainedContinuity is needed without a full-time hireA fractional program leader, about 10 hours a weekConsistent access to experienceThe startup still coordinates multiple resources
Development + manufacturingThe partner also has production capabilityA manufacturer finishes the design because it wants the production businessContinuity into productionA larger commitment, earlier

The more defined the work becomes, the easier it is to fix cost, schedule and responsibility. For manufacturers, the long-term value is often production, not the engineering project. Example figures are illustrative.

Be the client partners prioritize

Your program is the whole company to you. To a partner, it is one of many.

In an illustrative year, a development or manufacturing partner might support ten programs, hit six major milestones, run three transfer projects and see one or two commercial launches. Make it easy for them to know what matters most.

  • Clear priorities
  • Fast decisions
  • Defined milestones
  • Consistent communication
  • One accountable program lead on your side
08 · Decision gates

Why development projects stop, and how to see it coming.

A promising device can fail for reasons that have nothing to do with the original idea. The best teams look for weak signals early, before committing significantly more capital, time or resources.

Technical

Can it work?

Performance, reliability, safety and manufacturability against the requirements.

Market

Will people adopt it?

Clinician preference, workflow fit, hospital value analysis and reimbursement.

Business

Should we keep investing?

Cost of goods, margin, capital required, time to market and exit potential.

Illustrative gate review

Feasibility gate for a steerable catheter

  • Steering performancePASS
  • Torque transmissionPASS
  • Clinician feedbackPASS
  • Estimated unit costFAIL
$450Target selling price
$310Estimated build cost
<$150Target build cost

Technically ready for the next phase; commercially, the margin does not work at the current design.

The startup now has options

  • Reduce product cost through design for manufacturability
  • Change the design architecture
  • Target a different market or price point
  • Find a manufacturing partner with a better cost structure
  • License the technology
  • Stop the program

In this example the team redesigns the handle to cut cost before committing to verification, the cheapest point to make that change. A successful feasibility result does not mean the design is finished; it means the next decision is clearer.

ContinueThe project reaches the next milestone
ExpandA small engagement grows larger
TransferThe design moves to manufacturing
Pause / pivotMore funding or evidence is needed
StopThe technical or business case no longer supports investment
09 · Selecting a contract manufacturer

Choose the right manufacturing partner, not just the first one available.

Partner selection matters more as the product approaches scalable manufacturing. Balance technical capability, medical device experience, communication, schedule, cost and long-term fit.

STEP 1Define the need
STEP 2Find candidates
STEP 3Evaluate capabilities
STEP 4Evaluate fit
STEP 5Select a partner

Define what you actually need

  • What stage is the product in?
  • What problem are we solving, and what deliverable do we need?
  • Which budget and schedule constraints matter?
  • Development, transfer, testing or manufacturing?

Build a short list

  • Trusted referrals and advisors
  • Industry relationships and prior experience
  • Clinicians, suppliers and manufacturers
  • Conferences and industry groups

Evaluate technical fit

  • Have they built similar products?
  • Do they understand the technology?
  • Right engineering and process capabilities?
  • Can they support testing, documentation and scale?

Evaluate working fit

  • Communication: do they explain problems clearly?
  • Responsiveness: can they decide quickly?
  • Transparency: will they raise issues early?
  • Ownership: partner, or task-taker?
Easier to quote

A design transfer opportunity

  • Mature design: drawings, BOM, specifications
  • Defined requirements and manufacturing approach
  • Tooling, process, quality and validation scope identified
  • Clearer commercial opportunity
Harder to quote

A full development opportunity

  • Concept and initial design only
  • Unknown engineering effort and potential redesign
  • Technical, manufacturing and regulatory uncertainty
  • Unclear production volumes and open-ended scope

The more defined your product, the easier it is for manufacturers to compete for the work, and the better your terms.

Insider insight

Know the manufacturer in front of you.

Almost every contract manufacturer advertises both design and manufacturing. If they can manufacture, they want to manufacture: their business model is built around production. Large, stable production programs rarely appear out of nowhere, so many build in-house design and prototyping to keep a steady flow of growing customers.

For a startup, that means understanding how your product and your ask fit their business model. Labels like CDMO, CMO or CDO matter less than what the company actually does well. We help founders read those signals, build the short list and run the evaluation.

10 · Market adoption

The product is ready. Now the market has to be ready.

A device must do more than meet technical and regulatory requirements. It has to fit the U.S. healthcare market: how it is purchased, adopted, paid for and used. A cleared product can still fail commercially.

Product readyMarket accessAdoptionScale

Clinician

Will they want to use it?

Fewer steps, better outcomes or faster procedures, without new training burden.

Hospital / buyer

Will they approve it?

Value analysis committees weigh device cost against procedure time, outcomes and supplies.

Payer

Who pays for it?

Existing coding and payment may cover it, or new reimbursement evidence may be needed.

Distributor / partner

How will it reach customers?

A specialized distributor can reach early accounts faster than building a direct sales force.

Patient

Does it create meaningful value?

Shorter, safer or simpler care that patients and clinicians can feel.

Why devices get adopted

Clinical value

Measurably better for the patient or the procedure.

Economic value

Savings or revenue that justify the price for the hospital.

Workflow fit

Works within existing labs, staff roles and supplies.

Commercial execution

A credible plan to sell, distribute, train and support.

Late in development, the biggest remaining risk is often no longer technical. It is commercial execution. Building adoption hypotheses for each stakeholder early lets you test them alongside the engineering.

11 · The entrepreneur’s playbook

Right problem. Right partner. Right time.

Four principles to guide a medical device company through every stage of the journey.

01

Define the next milestone

Not the entire future. Know what problem needs solving, what stage you are in and which milestone matters next.

02

Match the partner to the problem

Not every partner needs to stay forever. Choose the project first, then the partner.

03

Increase commitment as confidence grows

Smaller, flexible, targeted spending early; larger infrastructure and manufacturing investment once risk is reduced.

04

Build the network before you need it

Relationships shorten the next step. Use the ecosystem instead of trying to own everything.

One startup, many relationships

No single organization carries a device from clinical need to market adoption. The startup stays at the center while the supporting team evolves.

Clinical ecosystemCreates the opportunity
Consultants & development partnersTurn the opportunity into a product
Testing & study partnersGenerate the evidence
Contract manufacturerTurns the design into a repeatable product
Commercial partnersTurn the product into a market opportunity
Clinicians, hospitals & patientsCreate adoption and impact
Start with the next step

Startups don’t succeed because they have every capability.

They succeed because they know which capability they need next. Birch Design helps founders decide, then delivers it, from feasibility and FDA strategy to design transfer and contract manufacturer selection.